Moderators: GAHorn, Karl Towle, Bruce Fenstermacher
N9149A wrote:At the same time you replace the main leaf spring, replace the AN7-20A bolt that attaches the tail wheel to the main spring. This one lasted at least 17 years with an average of 50 hours a year and one landing per hour that's 850 hours/landings. If it breaks on landing it WILL ruin your day.
KG wrote:Regarding using the L19 eye bolt on the tailwheel (item 14 on the first post of this thread), use the nylon locknut with caution. See this post with information about the nylon locknut:
http://www.cessna170.org/forums/viewtopic.php?f=2&t=7845
short version --- replace the nylon locknut with a steel locknut.
edit: the last L19 eye bolt that I bought did not come with a locknut, nylon or otherwise. So you'll have to supply your own steel locknut. The price of the bolt had also gone up considerably. I doubt if I would buy another one as it was over $40 delivered.
14. Install an L19 tailwheel tie-down eyebolt (PN 0642105) in lieu of the AN7-22A bolt that holds your tailwheel assy to the main leafspring.
Users browsing this forum: No registered users and 20 guests